No more planning around it
Plug in when you get home. No detours, no apps, no working out whether the station near the office is free.
Our owner-led, C-10 licensed in-house team installs Level 2 home EV chargers throughout San Diego County. We complete every project ourselves without subcontractors. You receive fixed pricing, and we handle the permits and schedule the city inspection for you.
Why Level 2
Plug in when you get home. No detours, no apps, no working out whether the station near the office is free.
Charging at home on an off-peak rate costs a fraction of a public DC fast charger, and you never queue for a stall.
A Level 2 circuit fills most batteries in six to eight hours. A standard household outlet can take three or four days to do the same job.
Typical cost
$749–$2,200
The installation price depends on your panel capacity, the circuit route and where the charger will be mounted. We include the charger circuit, materials, labor, permit and inspection in your quote. Longer runs, trenching or a panel upgrade can cost more; we confirm the scope and fixed price before work begins.
Customer reviews
Show us the panel with the door open and where the car parks. That is usually enough to get started.
We check whether your service has room for the charger circuit and identify the safest, most cost-effective setup.
You receive one clear number covering the permit, materials, installation and inspection visit.
We file with the jurisdiction that covers your address and handle the permit process and scheduling.
Our in-house team mounts the unit, runs the circuit, connects it to the panel and tests it at full amperage.
We coordinate the final inspection and meet the inspector, so your installation is signed off properly.
What we do
Licensed, permitted Level 2 home charger installation. Hardwired or NEMA 14-50, load calculation included, inspection scheduled for you.
Replacing a 100A or full 200A panel so your charger has a dedicated circuit, with SDG&E coordination and permit handling.
A dedicated 50A circuit and NEMA 14-50 receptacle, so a mobile connector charges at full speed without an extension cord.
Gen 3 Wall Connector mounted, hardwired, amperage set to your circuit and Wi-Fi commissioned before we leave.
A load-management device or energy meter lets a charger share capacity with the rest of the house, which often replaces a panel upgrade.
Diagnostics for chargers that trip, fault or stop delivering full amperage, plus swap-outs when a unit is past saving.
Service area
Permit authority, panel age and coastal exposure change by city. Pick yours and we will tell you what changes there.
Most San Diego homes land between $749 and $1,600 for a Level 2 install when the panel has an open double-pole slot and the run from panel to garage is under about 40 feet. Longer runs, trenching to a detached garage, or a panel with no capacity push it higher. If the panel needs replacing, budget $2,800 to $6,500 on top. We give a fixed price after a load calculation, not a range.
Yes. A 240V circuit for an EV charger requires an electrical permit everywhere in San Diego County. Incorporated cities issue their own; unincorporated areas like Spring Valley, Alpine and Ramona go through County Planning & Development Services. We pull the permit and schedule the inspection as part of the job. Unpermitted work can create problems when you sell the house and may affect an insurance claim.
A typical Level 2 install is a half-day, three to five hours. Panel upgrades run a full day and involve a planned power shutoff. Trenching to a detached garage adds time depending on the distance and surface.
Often, yes. A load-management device lets the charger share capacity with the rest of the house and back off when demand is high. On a 100A panel that is usually a few thousand dollars cheaper than a service upgrade, and because most people charge overnight when the house is quiet, the car still reaches full charge. We tell you which option fits after running the load calculation.
A hardwired charger connects directly to the circuit and can run at higher amperage — up to 48A on a 60A circuit — so it charges faster. A NEMA 14-50 outlet caps at 40A continuous and lets you unplug the unit and take it with you. Outlets are also required to be GFCI protected, which occasionally causes nuisance tripping with certain chargers. For a charger that stays put, hardwired is usually the better install.
Tesla Wall Connector, ChargePoint Home Flex, Emporia, Grizzl-E, Wallbox Pulsar Plus, Autel, Enphase, and the mobile connectors that ship with most EVs. If you have already bought a unit we will install it. If you have not, we will tell you honestly which ones we see fail and which ones we do not.
Not from the federal government any more. The federal EV charger credit (section 30C) ended for equipment placed in service after June 30, 2026, so it does not apply to new installs. SDG&E offers EV-specific time-of-use rate plans that make overnight charging cheaper, and its charger-related programs change from year to year, so check SDG&E’s current EV pages before you buy. We can point you at what is available, but we are electricians, not tax advisors.
Yes, though the path is different. California law has created pathways for EV charging in common-interest developments, but your association can still impose reasonable conditions and the install may need to be metered to your unit. Send us your HOA rules and a photo of the panel and we will tell you what is realistic.
Send a photo of your panel and where the car parks. We quote a fixed price and carry out the installation ourselves.
Prefer to talk? Call (619) 202-8501.